Home > Insights > Use Case

Use Case

Computime

Computime

How MSSB’s Mi-ACE delivered consistent above-target energy savings at a 24-hour electronics manufacturing facility: growing from 6% in the first month to achieving 12–15% by month four, with the facility’s own leadership expressing full confidence in sustaining double-digit performance.

KPJ Hospital Pakar Ampang Puteri

KPJ Ampang Puteri

A 24-hour hospital with critical humidity and fungal prevention requirements: MSSB Mi-ACE delivered sustained 12% energy savings without compromise to patient care, clinical comfort, or infection control standards.

Melaka International Trade Centre

MITC

A commercial building optimization project demonstrating improved cooling efficiency, cost savings, and sustainability through advanced chiller technology.

Seletar Mall

Seletar Mall

An energy optimization initiative showcasing how SLE strategies drive consistent savings and operational efficiency in controlled environments.

MIMOS Wafer Fab Project

MIMOS Wafer Fab

A smart industrial cooling optimization project demonstrating IoT-driven efficiency, sustainability, and cost savings in wafer fabrication.

Coming Soon

Coming Soon